The Construction Notice content is a hub for all communications related to any utility disruptions, construction notices, or other important notices to ensure residents are informed.
This includes but is not limited to:
- Traffic disruptions (detours, road construction, etc.)
- Utility impacts (water shutoffs, power shutoffs, water main flushing, etc.)
- Trails and open space disruptions (trail construction, playground notices, etc.)
Adding Construction Notice
Once logged in, go to the Drupal Admin toolbar and navigate to Content > Add content > Construction Notice.
Fill in the necessary fields:
- Title: Required For the name of the news item.
- Status: Choose from the dropdown.
- Timeline: Add the timeline for the project (i.e. January XX, XXXX - February XX, XXXX)
- Body: The main content of your news item
- Once you have filled out the above fields, select the Publish button at the top of the page.
Editing a Content Type
- To edit a specific node, click on Content in the Drupal toolbar.
- Filter content type dropdown by Construction Notice.
- Click the Filter button.
- Click edit to the right of your specific item in the Operations column or click the Title of your item and then click the Edit button.
- Make your desired edits.
- Once done, click the Publish button at the top of the page.